Roof spacers and JCLIPS are engineered to be used under commercial metal roof systems, allowing full recovery of the insulation blanket, between the roof safety wire mesh and the metal roof.
BENEFITS OF THE ROOF SPACE
| J-CLIP 75 | J-CLIP 120 |
|---|---|
| 75mm x 1200mm 6pc | 120mm x 1200mm 6pc |
| 2kg | 2.17kg |
| Insulation Thickness
100mm -110mm |
Insulation Thickness
130mm -145mm |
Section J in the Building Code of Australia (BCA) deals with energy efficiency of building structures and is a mandatory part
of the building design. In accordance to the BCA, the roof component of the building structure must meet the minimum
thermal resistance requirement of R3.2 for most Australian climate areas. In most cases, the minimum thermal resistance
requirements can be achieved by installation of bulk insulation underneath the roof cladding and between the purlins.
However, as per Section J in the BCA, any bulk insulation installed must be able to maintain its position and thickness.
We have developed the J-CLIP roof spacer to raise the roof cladding in order to fit the bulk installation and maintain its
thickness. This enables the roof component of the structure to conform to Section J of the BCA.
Cyclonic regions require 14 gauge screws. Due to the J-Clips superior strength and design, in NON – cyclonic
regions section 1 (as illustrated ) of a roof can have the J-Clip fitted missing every second screw, provided;
No 2 consecutive legs are unscrewed. Zones II and III are fully screwed, for example the J-Clips on the last 3
purlins at the gutter and the ridge as well as the 2 JClips adjacent to each barge, should be fully screwed.
There are currently no colour options available for this product.




For all quote requests or general enquiries, please complete the below form and our team will respond as soon as possible.
Complete the below form & our team will be in touch as soon as possible.